| Format/length: | n3 |
| HES item: | |
| National Codes: | |
| Default Codes: |
Notes:
The number of spell days of the MENTAL HEALTH CARE SPELL within the REPORTING PERIOD calculated from the:
| a. | START DATE (MENTAL HEALTH CARE SPELL) or START DATE of the REPORTING PERIOD where the START DATE (MENTAL HEALTH CARE SPELL) is before the START DATE of the REPORTING PERIOD | |
| and | ||
| b. | END DATE (MENTAL HEALTH CARE SPELL) or END DATE of the REPORTING PERIOD where the END DATE (MENTAL HEALTH CARE SPELL) is either: | |
| and | ||
| c. | not present i.e. the MENTAL HEALTH CARE SPELL has not ended | |
| and | ||
| d. | the END DATE (MENTAL HEALTH CARE SPELL) is after the END DATE of the REPORTING PERIOD | |
For example:
| 1 | If the START DATE of the REPORTING PERIOD is 2002/06/01 and the END DATE of the REPORTING PERIOD is 2002/08/01 and the START DATE (MENTAL HEALTH CARE SPELL) is 2002/07/01 and the END DATE (MENTAL HEALTH CARE SPELL) is 2002/07/28 then the spell days would be calculated from the dates 2002/07/01 and 2002/07/2 | |
| 2 | If the START DATE of the REPORTING PERIOD is 2002/06/01 and the END DATE of the REPORTING PERIOD is 2002/08/01 and the START DATE (MENTAL HEALTH CARE SPELL) is 2002/05/01 and the END DATE (MENTAL HEALTH CARE SPELL) is 2002/07/01 then the spell days would be calculated from the dates 2002/06/01 and 2002/07/01 | |
| 3 | If the START DATE of the REPORTING PERIOD is 2002/06/01 and the END DATE of the REPORTING PERIOD is 2002/08/01 and the START DATE (MENTAL HEALTH CARE SPELL) is 2002/05/01 and no END DATE (MENTAL HEALTH CARE SPELL) is present then the spell days would be calculated from the dates 2002/06/01 and to 2002/08/01 | |
The calculated SPELL DAYS IN REPORTING PERIOD should be recorded left justified with leading zeros.
This data element is also known by these names:
| Context | Alias |
|---|---|
| plural | SPELL DAYS IN REPORTING PERIODS |